by Cleary Inc | Feb 5, 2020 | Sewer
Scope of work: Included the installation of approximately 3,495 linear feet of 24” DIP gravity sewer, 2,360 linear feet of 18” PVC gravity sewer, 19 manholes, 10 check dams, by-pass pumping, and general sitework. Job...
by Cleary Inc | Feb 5, 2020 | Sewer, Treatment
Scope of work: Included the installation of a 5 million gallon EQ surge basin, 85 linear feet of 36” DIP, 272 linear feet of 24” DIP, 160 linear feet of 12” sewer line, 123 linear feet of 10” DIP, 145 linear feet of 8” forcemain, and 101 linear feet of 6” forcemain....
by Cleary Inc | Feb 5, 2020 | Rock Removal, Sewer
Scope of work: Included the installation of 1,055 linear feet of 18” PVC and DIP, 10,496 linear feet of 16” DIP and HDD, 3,240 linear feet of 12” PVC and DIP, 226 linear feet of 8” DIP, 1,746 linear feet of 6” DIP, bores, manholes, PVC laterals, services, and site...
by Cleary Inc | Feb 5, 2020 | Water
Scope of work: Included the installation approximately 700 linear feet of 36” HDPE, directional bore, 4” HDPE airline, and all necessary appurtenances. Job...
by Cleary Inc | Feb 5, 2020 | Water
Scope of work: Included construction of approximately 400 linear feet of 30” DIP raw water main above grade on piers up a steep embankment, 800 linear feet of 30” DIP raw water main, 2,200 linear feet 2” PVC, 1,300 linear feet of fiber optic cable. Also included was...