by Cleary Inc | Feb 5, 2020 | Gas, Rock Removal
Scope of work: Included the installation of approximately 4,334 linear feet of 16” steel gas main. Cleary Construction faced many obstacles in completing this project. One of which was the mountainous terrain. Sandblasting, hydrotesting, and foam trench spray was also...
by Cleary Inc | Feb 5, 2020 | Treatment
Scope of work: Includes the installation of 24,400 linear feet of 24-inch PVC, new Water Treatment plant, aerator tower with associated piping and appurtenances, demolition of old Water Treatment Plant, and modifications to existing water intake pump station. Job...
by Cleary Inc | Feb 5, 2020 | Rock Removal, Water
Scope of work: Included the installation of EQ facility basin, which holds 21 million gallons of water. Over 140,000 tons of rock were removed, 9,000 cubic yards of concrete poured, and over 5,000 gallons of paint to complete the project. The EQ basin can be seen off...
by Cleary Inc | Feb 5, 2020 | Sewer
Scope of work: Included the installation of approximately 3,495 linear feet of 24” DIP gravity sewer, 2,360 linear feet of 18” PVC gravity sewer, 19 manholes, 10 check dams, by-pass pumping, and general sitework. Job...
by Cleary Inc | Feb 5, 2020 | Sewer, Treatment
Scope of work: Included the installation of a 5 million gallon EQ surge basin, 85 linear feet of 36” DIP, 272 linear feet of 24” DIP, 160 linear feet of 12” sewer line, 123 linear feet of 10” DIP, 145 linear feet of 8” forcemain, and 101 linear feet of 6” forcemain....