Scope of work: Included construction of approximately 400 linear feet of 30” DIP raw water main above grade on piers up a steep embankment, 800 linear feet of 30” DIP raw water main, 2,200 linear feet 2” PVC, 1,300 linear feet of fiber optic cable. Also included was site restoration and testing. Job #17118
