Scope of work: Rehabilitation of existing 48” cast iron pipe, slip lining 8,000 linear feet of 42” welded steel pipe and open cut of 695 linear feet of 42” welded steel pipe. Installation of 250 linear feet of DIP ranging from 6” to 24” to tie into existing 24” water main. Also includes drain assembly connections and reconnecting distribution main to the existing 24” water main. Job #19041





