Our Projects

Our people and hi-tech equipment have delivered some of the best water, gas and sewer projects around you

Adams Field – Little Rock, AR

Adams Field – Little Rock, AR

Scope of work: Installation of 94 linear feet of 72” CCFRPM, 196 linear feet of 60” CCFRPM, 291 linear feet of 30” DIP, 199 linear feet of 6” DIP, 502 linear feet of 3” DIP, 405 linear feet of 1” DIP, 400 linear feet of 36” RCP, and 655 linear feet of 2” PE. Also includes installation of junction box and inlet. Job #20244

read more
Bowling Green Municipal Utilities – Bowling Green, KY

Bowling Green Municipal Utilities – Bowling Green, KY

Scope of work: Installation of 29,815 linear feet of 24” C900 pipe, 2,060 linear feet of 16” C900 pipe, 1,170 linear feet of 36” bore for 24” PVC, 530 linear feet of 24” PVC for open cut creek crossing, and 190 linear feet of 30” bore for 16” PVC. Also includes installation of 2-24” plug valves, 14” air combination valves and vaults, 2 flow meter and vaults, and an oxygen injection system. Job #19445

read more
Second Creek – Knoxville, TN

Second Creek – Knoxville, TN

Scope of work: Creek diversion and restoration, grade work, paving, and erosion control. Installation of 325 linear feet of 48” DIP laid into the creek, and an additional 275 linear feet of PVC installed 18’ in the ground. Job #19383

read more
Stream TDOT Williamson – Brentwood, TN

Stream TDOT Williamson – Brentwood, TN

Scope of work: Stream mitigation through temporary stream diversion, clearing, restoration, extensive landscaping, boulder jamming and vane riffles, cross vane structures, and erosion control. Installation of 236 linear feet of 12” slope drain. Job #19382

read more
Carson Loop – Birmingham, AL

Carson Loop – Birmingham, AL

Scope of work: Installation of approximately 16,000 linear feet of 24” DIP and boring of 1,700 linear feet. Also includes erosion control, traffic control, creek crossing, asphalt paving, and restoration. Job #19357

read more
Harpeth Valley – Nashville, TN

Harpeth Valley – Nashville, TN

Scope of work: Installation of approximately 16,000 linear feet of 24” DIP and boring of 1,700 linear feet. Also includes erosion control, traffic control, creek crossing, asphalt paving, and restoration. Job #19100

read more
Lexington Avenue – Louisville, KY

Lexington Avenue – Louisville, KY

Scope of work: Rehabilitation of existing 48” cast iron pipe, slip lining 8,000 linear feet of 42” welded steel pipe and open cut of 695 linear feet of 42” welded steel pipe. Installation of 250 linear feet of DIP ranging from 6” to 24” to tie into existing 24” water main. Also includes drain assembly connections and reconnecting distribution main to the existing 24” water main. Job #19041

read more
Beaver Creek – Knoxville, TN

Beaver Creek – Knoxville, TN

Scope of work: Installation of 13,740 linear feet of 48” DIP, 425 linear feet of 12” DIP, 865 linear feet of 8” DIP, along with 960 linear feet of 12” PVC and 1,030 linear feet of 8” PVC, and 585 linear feet of creek crossings. Extensive road boring, with 195 linear feet of 72”, 100 linear feet of 60”, 100 linear feet of 24”, and 190 linear feet of 16”. Job #18175

read more

Reach Us

For any specific information, get in touch with us.

Address
2006 Edmonton Rd,
Tompkinsville,
KY 42167

Contact
(270) 487 1784
info@clearyconstruction.com

    Leave a Message