Cleary brings together experienced teams, advanced equipment, and proven expertise to deliver complex civil construction projects across utility infrastructure, site development, asphalt paving, and heavy civil markets.

 

Green Mountain Booster – Huntsville, AL

Green Mountain Booster – Huntsville, AL

Scope of work: Construction of a new booster pump station and installation of 2,800 LF of 10″ welded steel transmission pipe up steep, rocky terrain to expand water supply for the Green Mountain community. Included a temporary bypass line to keep the existing water main in service during construction. System start-up (April 2025) exceeded the 420 PSI target operating pressure. $5.2M project for Huntsville Utilities. Job #23145.

read more
Flow for Our Future CMAR Project – Bowling Green, KY

Flow for Our Future CMAR Project – Bowling Green, KY

Scope of work: Construction of a new booster pump station and installation of 2,800 LF of 10″ welded steel transmission pipe up steep, rocky terrain to expand water supply for the Green Mountain community. Included a temporary bypass line to keep the existing water main in service during construction. System start-up (April 2025) exceeded the 420 PSI target operating pressure. $5.2M project for Huntsville Utilities. Job #23145.

read more
Pine Mountain Pipeline Replacement – Marietta, GA

Pine Mountain Pipeline Replacement – Marietta, GA

Scope of work: Replacement of aging 30″, 36″, and 42″ prestressed concrete pipe with approximately 24,700 LF of new 36″ zinc-coated ductile iron water main, running from Mars Hill Church Road to the Pine Mountain Ground Storage Tanks. Work was completed in phases, with a temporary 12″ DIP backup feed installed to keep the Pine Mountain Pump Station in service throughout construction. Project for the Cobb County–Marietta Water Authority. Job #23234.

read more
Adams Field – Little Rock, AR

Adams Field – Little Rock, AR

Scope of work: Installation of 94 linear feet of 72” CCFRPM, 196 linear feet of 60” CCFRPM, 291 linear feet of 30” DIP, 199 linear feet of 6” DIP, 502 linear feet of 3” DIP, 405 linear feet of 1” DIP, 400 linear feet of 36” RCP, and 655 linear feet of 2” PE. Also includes installation of junction box and inlet. Job #20244

read more
Bowling Green Municipal Utilities – Bowling Green, KY

Bowling Green Municipal Utilities – Bowling Green, KY

Scope of work: Installation of 29,815 linear feet of 24” C900 pipe, 2,060 linear feet of 16” C900 pipe, 1,170 linear feet of 36” bore for 24” PVC, 530 linear feet of 24” PVC for open cut creek crossing, and 190 linear feet of 30” bore for 16” PVC. Also includes installation of 2-24” plug valves, 14” air combination valves and vaults, 2 flow meter and vaults, and an oxygen injection system. Job #19445

read more
Second Creek – Knoxville, TN

Second Creek – Knoxville, TN

Scope of work: Creek diversion and restoration, grade work, paving, and erosion control. Installation of 325 linear feet of 48” DIP laid into the creek, and an additional 275 linear feet of PVC installed 18’ in the ground. Job #19383

read more
Stream TDOT Williamson – Brentwood, TN

Stream TDOT Williamson – Brentwood, TN

Scope of work: Stream mitigation through temporary stream diversion, clearing, restoration, extensive landscaping, boulder jamming and vane riffles, cross vane structures, and erosion control. Installation of 236 linear feet of 12” slope drain. Job #19382

read more
Carson Loop – Birmingham, AL

Carson Loop – Birmingham, AL

Scope of work: Installation of approximately 16,000 linear feet of 24” DIP and boring of 1,700 linear feet. Also includes erosion control, traffic control, creek crossing, asphalt paving, and restoration. Job #19357

read more

Reach Us

For any specific information, get in touch with us.

Address
2006 Edmonton Rd,
Tompkinsville,
KY 42167

Contact
(270) 487 1784
info@clearyconst.com

    Leave a Message