Interceptor Replacement- Phase 5 – Springfield, TN
Scope of work: Included the installation of 18,000 linear feet of 8” to 24” gravity sewer, 75 manholes, the rehabilitation of 3,900 linear feet of 18” CIPP, and 180 manholes. Job #18137
Horton Highway Utility District Natural Gas System Improvements Steel Gas Line – Chapel Hill, TN
Scope of work: Included the installation of approximately 24,700 linear feet of 6” steel gas line, 500 linear feet of bores under paved areas, railroad crossings, and creek crossing. Job #18073
City of Versailles Raw Water Main Replacement – Versailles, KY
Scope of work: Included construction of approximately 400 linear feet of 30” DIP raw water main above grade on piers up a steep embankment, 800 linear feet of 30” DIP raw water main, 2,200 linear feet 2” PVC, 1,300 linear feet of fiber optic cable. Also included was site restoration and testing. Job #17118
Raw Water Intake Structure – Curry, AL
Scope of work: Included the installation approximately 700 linear feet of 36” HDPE, directional bore, 4” HDPE airline, and all necessary appurtenances. Job #17079
TDOT Montgomery County Warfield Blvd Utilities – Clarksville, TN
Scope of work: Included the installation of 1,055 linear feet of 18” PVC and DIP, 10,496 linear feet of 16” DIP and HDD, 3,240 linear feet of 12” PVC and DIP, 226 linear feet of 8” DIP, 1,746 linear feet of 6” DIP, bores, manholes, PVC laterals, services, and site restoration. Job #17072
Sewer System Rehabilitation – 5 Million Gallon EQ Surge Basin – Lafayette, TN
The scope of work included the installation of a 5 million gallon EQ surge basin, 85 linear feet of 36” DIP, 272 linear feet of 24” DIP, 160 linear feet of 12” sewer line, 123 linear feet of 10” DIP, 145 linear feet of 8” forcemain, and 101 linear feet of 6” forcemain. Along with this, site restoration was a part of the project. Job #17031
Ladd Park Interceptor Sewer – Franklin, TN
Scope of work: Included the installation of approximately 3,495 linear feet of 24” DIP gravity sewer, 2,360 linear feet of 18” PVC gravity sewer, 19 manholes, 10 check dams, by-pass pumping, and general sitework. Job #16174
West Park EQ Facility Phase 2 – Nashville, TN
Scope of work: Included the installation of EQ facility basin, which holds 21 million gallons of water. Over 140,000 tons of rock were removed, 9,000 cubic yards of concrete poured, and over 5,000 gallons of paint to complete the project. The EQ basin can be seen off Briley Parkway in Nashville, TN. Job #15017
City of Morganfield – 24 inch Raw Water Line and Water Treatment Plant Aerator Replacement – Morganfield, KY
Scope of work: Includes the installation of 24,400 linear feet of 24-inch PVC, new Water Treatment plant, aerator tower with associated piping and appurtenances, demolition of old Water Treatment Plant, and modifications to existing water intake pump station. Job #17080
Knoxville Utility Board – Steel Gas Pipeline – Knoxville, TN
Scope of work: Included the installation of approximately 4,334 linear feet of 16” steel gas main. Cleary Construction faced many obstacles in completing this project. One of which was the mountainous terrain. Sandblasting, hydrotesting, and foam trench spray was also a crucial part of the project. Job #17212