Scope of work: Included the installation of a 5 million gallon EQ surge basin, 85 linear feet of 36” DIP, 272 linear feet of 24” DIP, 160 linear feet of 12” sewer line, 123 linear feet of 10” DIP, 145 linear feet of 8” forcemain, and 101 linear feet of 6” forcemain. Along with this, site restoration was a part of the project. Job #17031